IGNOU Synopsis Subject Code -BCA BCSP064

Synopsis Preparation & approval is very important work for completing the program . It is a final year project work which is performed in 6th semester or started in 5th sem after submission of 6th sem fee. So, before starting the project work you have to submit a synopsis on suitable topic for BCA Project. After submission bca synopsis, it analyze by the ignou university project team. After that they send you approval letter by post or send sms to collect the approval letter from the respective Regional Center. It takes approx 30 days.

You can Contact you Regional Center for the details . If you have any query or doubt then you can also contact Asst.Professor Navneet Vishwas or Team Ignou Friend. They guide you properly and help you to complete the project with best understanding.

So, if you want to write good ignou bca synopsis for bcsp064 course code then you have to focus on below things:

The project proposal should contain complete details in the following form:

  • Title of the Project
  • Introduction and Objectives of the Project
  • Project Category (RDBMS/OOPS/Networking/Multimedia/Artificial Intelligence/Expert Systems etc.)
  • Analysis (DFDs at least up to second level , ER Diagrams/ Class Diagrams/ Database Design etc. as per the project requirements).
  • A complete structure which includes: Number of modules and their description to provide an estimation of the student‟s effort on the project. Data Structures as per the project requirements for all the modules. Process Logic of each module. Testing process to be used. Reports generation ( Mention tentative content of report)
  • Tools / Platform, Hardware and Software Requirement specifications
  • Are you doing this project for any Industry/Client? Mention Yes/No. If Yes, Mention the Name and Address of the Industry or Client
  • Future scope and further enhancement of the project.

YOUR GUIDE MUST BE ELIGIBLE FOR PROJECT GUIDANCE

1. A person having M.Phil / Ph.D./M.Tech. in Computer Science.
OR
2. A person having B.E/B.Tech (Computer Science), MCA, M.Sc (Computer Science) with minimum 2 years experience in Industry / Teaching.

IGNOU BCA Project work divided in two parts:

1. Synopsis – BCA bscp064 and
2. Project Report – BCA bcsp064

BCA Synopsis & Project (IGNOU BCSP064)

Dear Ignou Learners, for the preparation of bca synopsis you have to follow the below steps:
  • Suitable title selection for bca project
  • Make all necessary details about bca project which you want to developed.
  • Actually Synopsis is also known as project proposal, by the help of this you get permission from the university to developed proposed project.
  • Insert necessary diagram, platform, limitation, scope, bibliography in the synopsis.
  • It should be 15 to 20 pages approximately

Approval of Synopsis

  • After submission of synopsis, it is evaluated by university
  • After evaluation and getting synopsis approval you can prepare project report

Project Report

  • After approval you can start project report preparation
  • for BCA MCA B.Tech Program it should be 90 to 150 pages and you have to develop any software/ website or any application. In project report source code must be inserted. After submission of project you called for viva. At the viva time must keep project report + CD (Source Code)
  • For other program project report should be 60 to 120 pages. you have to elaborate more about the topic with proper diagram, test case etc. After submission of project you called for viva. At the viva time must keep project report. we provide you some selected question answer to crack the viva

IGNOU bca bcsp064 – Synopsis & Project submission date

Session Type of Submission Date
January Synopsis for bca bcsp064 1st April to 30th June
July Synopsis bca bcsp064 1st October to 31st December
January Project bca bcsp064 1st January to 31st March
July Project bca bcsp064 1st July to 30th September
Source: www.ignou.ac.in

IGNOU BCA Project Approval Best Platform

Best Combination for WEB BASED PROJECT

=> PHP + My SQL + APACHE
=> ASP.Net With C# + SQL Server + IIS
=> JSP + My SQL + Apache
=> PHP + HTML + CSS + XAMPP + My SQL

GET BEST Support for IGNOU BCA BCSP064, CS76 Final Year Project Guidance

  • TOPIC SELECTION
  • SYNOPSIS Support for IGNOU BCA BCSP064 Program
  • PROJECT REPORT Support for IGNOU BCA BCSP064 Program
  • EXECUTABLE SOURCE CODE for IGNOU BCA BCSP064 Program – We help you for Developing
  • VIVA SELECTED QUESTION ANSWERS for IGNOU BCA BCSP064 Program
  • STEP BY STEP GUIDANCE
  • We Maintain the quality for the best knowledge and Learning. So, in this program you must learn lots of new things for your career Growth. Performing this you are able to crack the viva & Complete the IGNOU Project work related to your BCA BCSP064 Program
  • Contact us for any query or doubt, We guide you to solve

Wish You Success
Navneet Vishwas & Team IGNOU Friend

Benefits: This Article is written for the complete overview to the ignou aspirants related to Bca bcsp064 synopsis & project work. This is also helpful for smu,jnu, du, ipu & other university aspirants related to BCA, MCA, IT, CSE & other computer Science Program. The author & Asst. Professor Navneet Vishwas is happy to solve your related query or doubt. Our aim to make the contribution to the society for the knowledge growth. Through the article you know about the process of ignou synopsis & project approval work. Synopsis & Project preparation process. And finally you are able to complete your bca program. If you have some backlog or pending paper related to bca proram the you can contact us for best notes and study guidance. You can also watch video lecture by Navneet Vishwas or follow the tips and technique provided by him.

LIST OF BROAD AREAS OF APPLICATION AND RELATED TOOLS

FRONT END / GUI Tools :
Visual Basic, Power Builder, X-Windows (X/lib, X/motif, X/Intrinsic), Oracle Developer 2000,VC++, Jbuilder

RDBMS/BACK END :
Oracle, Ingres, Sybase, Progress, SQL Plus, Versant, MY SQL, SQL Server, DB2

LANGUAGES :
C, C++, Java, VC++, C#, Php, Java

SCRIPTING LANGUAGES :
PERL, SHELL Scripts(Unix), TcL/TK

RDBMS/BACK END :
Oracle, Ingres, Sybase, Progress, SQL Plus, Versant, MY SQL, SQL Server, DB2, My Sql

MIDDLE WARE (COMPONENT) TECHNOLOGIES :
COM/DCOM, Active-X, EJB, Rational Rose, MSMQ, BEA, Message Q, MTS, CICS

UNIX INTERNALS :
Device Drivers, Pipes, RPC, Threads, Sockets
ARCHITECTURAL CONCEPTS :
CORBA, TUXEDO

INTERNET TECHNOLOGIES :
DHTML, Java script, VB Script, Perl & CGI script, HTML, Java, Active X, RMI, CORBA, SWING, JSP, ASP, XML, EJB, Java Beans, Java Servlets, Visual Age for JAVA, UML, VRML, WML, iPlanet, ATG, BigTalk, CSS, XSL, Oracle ASP server, VB.Net, AWT, J2EE, LDAP, ColdFusion

NETWORKING TECHNOLOGIES :
ATM, Frame Relay, TCP/IP, SNMP, GSM, VoIP, PPP, IP-PSTN, SONET/SDH

WIRELESS TECHNOLOGIES :
Blue Tooth, 3G, ISDN, EDGE
REALTIME OPERATING SYSTEM/

EMBEDDED SKILLS :
QNX, LINUX, OSEK, DSP, VRTX, RTXC, Nucleus

OPERATING SYSTEMS :
WINDOWS 95/98/2000/ME, WINDOWS NT, UNIX, LINUX, IRIX, SUN SOLARIS, HP/UX, PSOS, VxWorks, AS400, AIX, WINDOWS XP, DOS

APPLICATIONS :
Financial/ Manufacturing/ Multimedia/ Computer Graphics/ Instructional Design/ Database Management System/ Internet/ Intranet/ Computer Networking-Communication Software/E-Commerce/ ERP / MRP/ TCP/IP Internals/ Routing protocols/ Socket Programming/ Implementation of Switches & Routers
Note: Projects should not be developed using the packages like Dbase, Foxpro, Visual Foxpro . Also, projects should not be developed using the combination of Visual Basic as the front end and MS-Access as the back end.

Source: www.ignou.ac.in | Author suggest you to also verify details from respective university website. This article has no legal validity and copyright protected by the concern website.